Royal Berkshire Fire and Rescue Service - Refurbishments
Logic has successfully completed the refurbishment and minor layout alteration works to selected areas of Slough Fire Station. The works included but limited to:
- – Refurbishment/conversion of Male WC & showers to 4 individual WC & shower rooms.
- – Refurbishment/conversion of existing Accessible shower and circulation area to Red Wash
- – Shower and swim locker storage area.
- – Refurbishment of kit room and installation of new Geargrid lockers.
- – Refurbishment of locker room and installation of new lockers.
- – Erection of new stud partitioning walls to dormitories to form 9 individual bedrooms.
- – Conversion of current lobby to new Accessible WC & shower area with new drainage connection.
- – New partition wall and entrance to Office with full refurbishment.
- – Refurbishment of Offices 2 and 3.
- – Conversion of current drying room to new clean side laundry room.
- – Removal of existing door to lobby and installation of new entrance door to Office 1.
- – Refurbishment/conversion of first floor WC to new WC & shower
- – Conversion of existing pole drop to new WC.
- – Refurbishment of the first floor mess room and construction of partition walls to form a new meeting room.
- – Refurbishment of dirty side laundry room