London Borough of Merton - Primary Schools

LCS successfully completed the refurbishment of toilet blocks at two school sites for the London Borough of Merton Council. The project involved replacing cubicles and sanitaryware, installing resin flooring and hygienic wall cladding, and modifying existing MEP systems. Work was carefully phased to minimise disruption during term time, with all tasks completed on time and to a high standard, resulting in positive client feedback.

 

  • – Secured and completed toilet block refurbishment at two school sites.
  • – Replaced toilet cubicles and sanitaryware.
  • – Installed resin flooring (outsourced to approved subcontractor).
  • – Installed hygienic wall cladding.
  • – Modified existing mechanical, electrical, and plumbing (MEP) systems.
  • – Completed interior decorating and related building works.
  • – Managed on-site by a full-time, SMSTS-certified site manager.
  • – All LCS staff were enhanced DBS checked.
  • – Provided necessary certifications to the client before starting work.
  • – Work conducted during term time with minimal disruption to school activities.
  • – Disruptive tasks scheduled for weekends and February half-term.
  • – Thorough planning to handle limited space and access challenges.
  • – Project completed on time with zero safety incidents.
  • – Received positive feedback from the client.